The timeline of a stone job, from first visit to handover

Blocks at our factory. A stone job runs from choosing the slab to the final polish.
Blocks at our factory. A stone job runs from choosing the slab to the final polish.

People often expect stone to be ordered on Monday and installed by Friday. Some small jobs are, but most follow a sequence that depends on the rest of the construction. Knowing the stages helps you plan the cabinet maker, plumber and painter around the stone rather than against it. Timings below are typical and vary with the job size and the season.

1. Planning and choosing

  • Share plans or room sizes, and discuss the stones and finishes for each area.
  • Visit the yard and choose the actual slabs or lot. Photograph them with their numbers.
  • Receive an itemised quote and agree it.

2. Site ready

  • For floors: base levelled and cured, levels agreed, walls plastered.
  • For kitchens: cabinets installed and fixed, sink, hob and taps chosen.
  • For stairs: concrete stair finished and cured.

3. Measurement

Floors can be quoted from plans, but stairs and counters are measured on site once the base or cabinets are ready. Counters need a template; this is the moment to confirm sink positions, overhangs and seams.

4. Cutting and fabrication

The factory cuts tiles, treads, skirting, counters, cut-outs and edges. Simple floor orders can be quick; kitchens with mitred edges or inlay floors take longer.

5. Delivery

Stone is delivered on edge, checked on arrival, and stored correctly on site. See our article on transport and storage.

6. Installation

  • Floors are laid, then left to cure before grouting and traffic.
  • Counters are fitted, seams bonded, sinks fixed.
  • Stairs are laid tread by tread.

7. Other trades

Painters, electricians and carpenters finish their work while the stone is protected.

8. Grinding, polishing and sealing

Once everything else is done and the floor is dry, marble floors are ground and polished, then sealed.

9. Handover

Walk the job in daylight, tap-test floors, check joints, edges and seams, and receive care instructions and spare stone. Our installation handover checklist covers every point.

Order the stone early, even if installation is months away. It secures the lot you chose and avoids a mismatch later.

Tell us where your construction is now and we will suggest when each stone stage should happen. WhatsApp +92 320 9900948.

Get a quote

Send us the room. We’ll send back the stone.

WhatsApp a drawing, a BOQ or just a photo of the room. Or come to the yard at Rawat and pick the slab yourself. We reply within one working day.